The Case of the Skyscraper That Changed in Midair
It all began when the specs on a new 19-story office tower were altered in mid-construction. Suddenly the owners required 20 offices per floor, up from the original 16 – meaning the number of outdoor air conditioning units would have to rise, too. Or would they?
Enter Daikin®’s VRV®. The system’s increased efficiency and patented R-410A refrigerant provided 17% greater cooling, absorbing the space increase with no problem. As a bonus, cooling and electrical-supply costs dropped 7% and 20%, respectively, with a 48% lower plant footprint area. So instead of sweating out the new office additions, the building’s handlers turned it into cool cost savings.
Read more success stories:
- Historic Lloyd Street Synagogue, Maryland
- Post Falls Periodontists(PDF)
- Western Extralite(PDF)
- Dallas-Fort Worth Area School District
- University of Hawaii at Manoa
- Meadows at Oldwick - a study of an assisted living facility for people with disabilities
- ASHRAE Headquarters renovation
- Warwick House of Hope
- Hoosick Valley Church
- New Skyscraper Construction
- Office Building Retrofit
- Historical Hotel Upgrade
- Hilton Hotel in Manchester, UK (VRV-WII case study)